DA, BA, Tendering: Understanding the Stages of Your Build

DA, BA, Tendering: Understanding the Stages of Your Build

The path from design concept to construction site isn’t always straightforward—especially when you’re navigating the complex world of luxury residential or commercial projects. Knowing the key phases—DA, BA, and tendering—will help you make confident decisions, avoid unnecessary delays, and stay in control of your build.

DA: Development Application

The Development Application (DA) is submitted to your local council and assesses the proposal against zoning, land use, and environmental guidelines. This includes site layout, building height, setbacks, overshadowing, and traffic impact. DA approval focuses on how your design affects the broader community—not the fine details. It’s typically required for new builds, major renovations, and heritage sites.

BA: Building Approval (or Construction Certificate)

Once DA is granted, you’ll need a Building Approval (BA) or Construction Certificate. This is usually handled by a private certifier and confirms the design complies with the Building Code of Australia and relevant technical standards. The BA stage includes full documentation: structural engineering, stormwater, energy assessments, and detailed specifications. Without BA, you can’t legally begin construction.

Tendering: Choosing the Right Builder

With documentation complete, the tendering stage invites qualified builders to price your project based on the exact specifications. It’s a critical step—not just for cost control, but for aligning with a builder who understands your design goals and standards. A formal tender process promotes transparency, encourages competitive pricing, and reduces variation risk during construction.

FAQs

Can DA and BA be combined?

In some cases, a Complying Development Certificate (CDC) can replace both DA and BA, but only for simpler builds. Most prestige or custom projects will need both.

How long does DA approval take?

Council processing times vary, but most DAs take 6–12 weeks. Delays are common if documentation is incomplete or objections arise.

Do I need a DA for internal renovations?

Not always. Internal works that don’t affect the structure or external appearance may be exempt, but it’s best to confirm with your local council or certifier.

What’s included in a full tender package?

A complete tender includes architectural(1) drawings, engineering, finishes schedules, specifications, and any required reports—ensuring accurate, apples-for-apples pricing.

Can I get builder quotes without completing the BA stage?

It’s not recommended. Early quotes based on concept plans lack precision and can lead to major cost overruns later.

Final Thoughts

The success of your project isn’t just about great design—it’s about timing, approvals, and working with the right team. Understanding how DA, BA, and tendering fit together gives you a clearer view of the entire process. With the right guidance, each phase builds momentum, reducing stress and setting your project up for success on site.

Ready to move forward with confidence? Start by speaking to a designer who understands not just what to build—but how to get it built.

Notes:

(1) All services provided by ISA Collective and those represented by this firm are building design services only. ISA Collective is expressly not an architect and does not engage in architectural services, architectural design or architectural design services and all other terms that are defined in the Architects Act 2002 (QLD).
DISCLAIMER: The content provided on this blog is for informational and educational purposes only. While we strive to provide accurate, up-to-date, and relevant information regarding design and construction considerations, the advice provided herein should not be construed as professional or legal guidance/advice.

Related Blogs

All services provided by ISA Collective and those represented by this firm are building design services only. ISA Collective is expressly not an architect and does not engage in architectural services, architectural design or architectural design services and all other terms that are defined in the Architects Act 2002 (QLD).

Copyright © 2025 ISA Collective. All Rights Reserved.